Construction works have officially commenced to build a new pumping station aimed at connecting the Fourth Sector's sewage network to the main collector channel. This project is part of the precautionary measures implemented by Adra Industrial City to enhance its wastewater and rainwater drainage system.These works are being carried out in preparation for the winter season, particularly during periods of heavy rainfall in the region. This initiative will improve water flow, prevent accumulation, and ensure the continuous, high-efficiency operation of both the sanitary and stormwater drainage networks
24/8/2026