The Technical Department at the Adra Industrial City Management has launched intensive extraction, installation, and maintenance works on Pump No. 4 in the Mountain area.These rehabilitation works are part of an integrated operational plan aimed at achieving the following:Raising the efficiency of the technical water system.Improving the continuity of pumping operations along the mentioned axis.Boosting water support for operational industrial facilities.Ensuring a stable supply of water suitable for industrial production.This step falls within the framework of ongoing executive efforts by the city's management to support the production sector and meet the requirements of operating factories
14/7/2026